Hi Akshay,
In MMRV Current Period should 03 2014, Previous Period 02 2014 If not change the current period to 03 2014 in MMPV.
OB52:
As shown below,Change 2013 to 2014.
Change from period2 to 16
Change year 2014 to 2011
Change year 2015 to 2014
It should be like this:
Eg: 1000 / + / / ZZZZZZZZZ / 1 / 2011 / 12 / 2014 / 13 / 2011/16/2014
Change, check and revert.
Thanks & Regards,
Ramagiri