Hi Kamal,
Thanks for your answer.
I have some can not imagine how could this work. Let me explain this more in detail:
1.- We have set up COPA valuation mapping all cost elements from cost estimate price. It is a requirement to have a cost estimate to allow billing released to accountin. As it is not possible to release future cost from ML if current or future estimate cost exist, the proposed solution is to blank cost estimate thorugh CKR1. After current cost estimate is blanked all billings will be blocked to accounting.
Is there a way to replace current standard cost with future standard cost from ML?
2.- Currently we got actual ML price in COPA as follow:
a. Current estimate price from valuation
b. Difference vs ML price performing re-valuation functionality (KE27).
Should we set up COPA in a different way to capture detailed ML price directly from ML?
3.- I can not figure out how valuation will work.
I hope these could give you enough detail of the issue we are facing.
Another option proposed from the note is to change the error message detailed in the subject to warning.....but again, how differences in prices between ML future price and cost estimate will work?
Best regards,
Jorge