Hi SAP Experts, please help in the below issue,
Remove from storage MvT 313 from storage loc 0001 to 0002, Quantity = 5 PC, Material doc number 100 generated
Cancel Material doc number 100 with MvT 314, Material doc number 101 generated
New transaction, Remove from storage MvT 313 from storage loc 0001 to 0002, Qnantity 25, Material doc number 102 generated
Place in storage with reference to material doc 100 (already cancelled) the system allow to receive from the cancelled material doc
But if i try to receive 25 PC from the last mat doc 102, the system allow only 20 PC
How can i prevent this action? i want to prevent receiving any quantity from the cancelled material doc (doc 100) and allow receiving of 25 PC from the last material doc (doc 102)
Thanks in advance